COMPONENTS
ILLUSTRATION
Installation
INSTALLATION
PROCEDURE
1. INSTALL NO. 2 OIL COOLER TUBE SUB-ASSEMBLY
(a) Temporarily install the oil cooler tube to the fan shroud with bolt
A. Install bolt B and tighten it to the specified torque. Then tighten bolt
A to the specified to ...
Reassembly
REASSEMBLY
PROCEDURE
1. INSTALL SHIFT LOCK CONTROL ECU SUB-ASSEMBLY
(a) Attach the 3 claws to install the shift lock control ECU to the transmission
floor shift.
(b) Connect the shift lock solenoid connector to the shift lock control ECU.
2. INSTALL IND ...