INSTALLATION
PROCEDURE
1. INSTALL NAVIGATION ANTENNA ASSEMBLY
(a) Install the antenna with the 2 screws.
Torque:
2.5 N·m {25 kgf·cm, 22 in·lbf}
(b) Attach the clamp.
2. INSTALL DEFROSTER NOZZLE ASSEMBLY
3. INSTALL NO. 3 HEATER TO REGISTER DUCT
4. INSTALL NO. 2 SIDE DEFROSTER NOZZLE DUCT
5. INSTALL NO. 1 SIDE DEFROSTER NOZZLE DUCT
6. INSTALL NO. 2 HEATER TO REGISTER DUCT
7. INSTALL NO. 1 HEATER TO REGISTER DUCT
8. INSTALL INSTRUMENT PANEL SUB-ASSEMBLY
(a) Install the instrument panel sub-assembly (See page ).
9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page ).
Prl Update
PRL UPDATE
1. PRL UPDATE
This function updates the PRL (Preferred Roaming List) of the DCM (Telematics
Transceiver). The PRL is a large set of phone numbers the DCM (Telematics Transceiver)
can utilize to make an emergency call when outside (roaming) the ...
Extension Housing Rear Oil Seal
Components
COMPONENTS
ILLUSTRATION
Replacement
REPLACEMENT
PROCEDURE
1. REMOVE PROPELLER SHAFT ASSEMBLY
(a) Remove the propeller shaft (See page ).
2. REMOVE AUTOMATIC TRANSMISSION EXTENSION HOUSING OIL SEAL
(a) Using SST, remove the oil seal ...