INSTALLATION
PROCEDURE
1. INSTALL CENTER POWER OUTLET SOCKET COVER
(a) Attach the 2 claws to install the center power outlet socket cover.
HINT:
Use the same procedure as for the other sides.
2. INSTALL NO. 3 POWER OUTLET SOCKET ASSEMBLY
(a) Attach the claw to install the No. 3 power outlet socket assembly.
(b) Attach the connector clamp.
HINT:
Use the same procedure as for the other sides.
3. INSTALL REAR CONSOLE END PANEL
4. INSTALL NO. 1 POWER OUTLET SOCKET COVER
(a) Attach the 2 claws to install the No. 1 power outlet socket cover.
5. INSTALL NO. 1 POWER OUTLET SOCKET ASSEMBLY
(a) Attach the claw to install the No. 1 power outlet socket assembly.
(b) Connect the No. 1 power outlet socket assembly connector.
6. INSTALL REAR CONSOLE BOX ASSEMBLY
7. INSTALL NO. 2 CONSOLE BOX RETAINER
8. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY
9. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for VF2A)
10. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY
11. INSTALL FRONT NO. 2 CONSOLE BOX INSERT
12. INSTALL FRONT NO. 1 CONSOLE BOX INSERT
13. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH
14. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH
Data List / Active Test
DATA LIST / ACTIVE TEST
1. DATA LIST
HINT:
Using the Techstream to read the Data List allows the values or states of switches,
sensors, actuators and other items to be read without removing any parts. This non-intrusive
inspection can be very useful bec ...
Reassembly
REASSEMBLY
PROCEDURE
1. INSTALL REAR PROPELLER SHAFT UNIVERSAL JOINT SPIDER BEARING
HINT:
Use the same procedure for all rear propeller shaft universal joint spider bearing.
(a) Apply MP grease to the universal joint spider and new bearings.
...