INSTALLATION
PROCEDURE
1. INSTALL NAVIGATION ANTENNA ASSEMBLY
(a) Install the antenna with the 2 screws.
Torque:
2.5 N·m {25 kgf·cm, 22 in·lbf}
(b) Attach the clamp.
2. INSTALL DEFROSTER NOZZLE ASSEMBLY
3. INSTALL NO. 3 HEATER TO REGISTER DUCT
4. INSTALL NO. 2 SIDE DEFROSTER NOZZLE DUCT
5. INSTALL NO. 1 SIDE DEFROSTER NOZZLE DUCT
6. INSTALL NO. 2 HEATER TO REGISTER DUCT
7. INSTALL NO. 1 HEATER TO REGISTER DUCT
8. INSTALL INSTRUMENT PANEL SUB-ASSEMBLY
(a) Install the instrument panel sub-assembly (See page
).
9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable
is reconnected (See page ).
Ejecting CDs
Ejecting a CD (type A and B) Press
and remove the CD.
Ejecting a CD (type C) To
select the CD to be ejected, press
( ) or
(
).
The selected CD number is shown
on the display.
Press and remove the CD.
Ejecting all the CDs (type C only) Press ...
Installation
INSTALLATION
CAUTION / NOTICE / HINT
CAUTION:
Wear protective gloves. Sharp areas on the parts may injure your hands.
HINT:
A bolt without a torque specification is shown in the standard bolt chart (See
page ).
PROCEDURE
1. INSTALL REAR SEAT CUSHION ...