INSTALLATION
PROCEDURE
1. INSTALL GENERATOR ASSEMBLY
(a) Install the generator bracket to the generator with the bolt.
Torque:
20 N·m {204 kgf·cm, 15 ft·lbf}
(b) Install the generator with the 2 bolts.
Torque:
43 N·m {438 kgf·cm, 32 ft·lbf}
(c) Install the generator bracket with the bolt.
Torque:
20 N·m {204 kgf·cm, 15 ft·lbf}
(d) Attach the wire harness clamp.
(e) Install the wire harness with the 2 bolts.
Torque:
8.0 N·m {82 kgf·cm, 71 in·lbf}
(f) Connect the generator connector to the generator.
(g) Install the generator wire with the nut.
Torque:
9.8 N·m {100 kgf·cm, 87 in·lbf}
(h) Close the terminal cap.
2. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR
3. INSTALL WIRING HARNESS CLAMP BRACKET
(a) Install the wiring harness clamp bracket with the bolt.
Torque:
8.0 N·m {82 kgf·cm, 71 in·lbf}
(b) Attach the clamp.
4. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY
(a) for Integrated Type:
Install the No. 2 idler pulley with the bolt.
Torque:
54 N·m {551 kgf·cm, 40 ft·lbf}
(b) for Separate Type:
Install the idler pulley cover plate, No. 2 idler pulley and No. 2 idler pulley cover plate with the bolt.
Torque:
54 N·m {551 kgf·cm, 40 ft·lbf}
5. INSTALL FAN AND GENERATOR V BELT
6. INSTALL V-BANK COVER
7. INSTALL BATTERY TRAY
8. INSTALL BATTERY
9. INSTALL BATTERY CLAMP
(a) Install the battery clamp with the 2 nuts.
Torque:
6.0 N·m {61 kgf·cm, 53 in·lbf}
10. CONNECT CABLE TO POSITIVE BATTERY TERMINAL
11. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable
is reconnected (See page ).
Inspection
INSPECTION
PROCEDURE
1. TRANSFER SYSTEM
NOTICE:
To shift from H2 to H4, move the transfer shift lever while keeping
the wheels facing straight ahead.
To shift from H4 to L4, stop the vehicle, move the shift lever to N
and then move the ...
Components
COMPONENTS
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
...